1.0 PURPOSE
The purpose of this procedure is to describe the protocols for performing
and reporting surveillance inspection activities.
2.0 SCOPE
This procedure applies to all inspection activities and reports generated
by QA Management Services' personnel where requirements have not otherwise been
specified by the client. Variations to this procedure, where specified, will be
included in job specific briefs.
3.0 REFERENCES
PMP2-07-01 Consultancy Assignments.
PMP2-07-10 Preparation of "Briefs" for the Provision of Services.
4.0 DEFINITIONS
4.1 Inspection Report
A document describing in detail all those observations or
measurements recorded during an assignment at a place of supply or manufacture.
4.2 Delivery Terminology (Incoterms)
FOB Free On Board
FAS Free Alongside Ship
EXW Ex Works.
5.0 PROCEDURE DETAILS
5.1 Inspection Surveillance
5.1.1 Initiating Surveillance
Inspection activities shall be performed as outlined in the
"Inspection Brief" and/or the vendor's Inspection and Test Plan as appropriate. On
receipt of any new inspection assignment, the inspector shall acknowledge receipt
to the Q.A. Management Services co-ordinating officer by fax or E-mail immediately.
The inspector shall then make telephone contact with the vendor to establish a time
and date for the first site visit.
5.1.2 Pre-Inspection Meeting
If required in the brief a Pre-Inspection Meeting shall be
convened and chaired by the inspector. The following agenda shall be used:
- Introductions
- Review workscope
- Key personnel/contacts
- Lines of communication
- Resource requirements
- Designs/drawings
- Non conformance reporting
- Sub-contractors
- Traceability requirements
- Free issue materials
- Review ITP requirements
- Document deliverables
- MDR compilation.
The inspector shall prepare minutes and issue within 48
hours of the meeting, or as defined in the Brief.
5.2. Surveillance Tasks
In addition to ITP requirements, the inspector should be cognisant
of the following activities on each visit to the vendor's premises.
5.2.1 Document/Drawing Management
All project drawings and specifications shall be controlled
such that only the pertinent version or revision is available at the required
locations. The inspector shall check registers to ensure original and amendments
to such documents have been distributed to the appropriate personnel and that the
current version of any drawing/document is being used e.g. manufacture is being
carried out using the current version of a drawing.
5.2.2 Sub-Contractors
Any portion of the works that is to be sub-contracted must
be highlighted on reports. The client may wish for surveillance activities to
extend to sub-contractors. The inspector should enquire as to what level of
surveillance and control the vendor intends to impose on his subcontractors. Also,
the inspector should review the selection process, e.g. are sub-contracts purely
awarded on the basis of lowest price or is a detailed prequalification exercise
undertaken?
5.2.3 Manufacture/Fabrication Control
Inspectors must be aware that our role is usually to
represent the client (second party) or as an independent third party surveillance
body. The vendor has a responsibility to perform all front-line QC activities and
we are to ensure that this is carried out effectively. Our monitoring of the
manufacturing process should not be restricted to (for example) viewing welding or
performing dimensional checks. We should satisfy ourselves that the vendor's
system imposes adequate controls from receipt of an order through to order
processing and the whole manufacturing process including packaging, preservation
and despatch. ITP's (or equivalent documents) should be used by the vendor as a
means to ensure that progress does not proceed to the next stage of manufacture
until the relevant inspections and tests have been performed.
5.2.4 Welding/Welder Surveillance
All welding will normally be required to comply with a
client nominated code. For coded welding a welding procedure specification will
need to be proposed for client approval, which in many cases will require a review
from our nominated inspector. On approval of the WPS, the procedure will require
qualification (if not previously qualified) and the qualification records (WPQR)
will require our review and possible endorsement. Only welders qualified to weld
to the essential parameters of the WPS shall be used for the work. The inspector
shall review welder records and ensure that some form of identification system is
used to each welder engaged on the project.
Welding itself shall be monitored for compliance to code
requirements. Where specified in the ITP, weld profiles and fit ups shall be
approved by the inspector prior to commencement of welding. The inspector shall
ensure that weld traceability data is recorded in 'real time' onto daily welding
reports, for subsequent transposition onto MDR records. Completed welding should
be, at least, visually examined for non-surface breaking defects, undercut,
stop/start cracks and completeness. Special attention should be taken to ensure
complete welding is done when specified (not stitched).
5.2.5 Inspection Measuring and Test Equipment
Requirements for calibration of test equipment and the
required level of accuracy will normally be nominated by the client and/or
applicable code. As a guide, the following equipment will normally require some
form of calibration records:
- Tong Testers
- Thermometers
- NDT Equipment
- Hardness Testers
- Mechanical Test Equipment
- Pressure Gauges (for hydro tests)
- Paint Thickness Gauges
- Welding Machines.
- Linear Measuring Equipment (e.g. vernier,
micrometers, etc.)
On commencement of any new assignment, the nominated
inspector shall satisfy himself that the vendor adequately manages the accuracy,
storage and relevant environmental conditions of all inspection, measuring and test
equipment. In the case of hydrostatic tests, a copy of the relevant calibration
certificate shall be appended to our report. All calibration certificates issued
within Australia should ideally be NATA endorsed or clearly demonstrate
traceability to national standards.
As an absolute minimum requirement all interface dimensions
and squareness checks must be made to ensure equipment fits into the plant which it
is going. The inspector shall only use vendor supplied, certified measuring and
test equipment.
5.2.6 NDT Surveillance
Where required by the inspection brief, NDT activities
shall be monitored by the inspector. This may involve:
a) Secondary interpretation of radiographs and a
review of film quality.
b) Reviews of NDT operator qualifications and
experience.
c) Review and endorsement of NDT reports.
d) Review of the NDT sub-contractor's facilities for
adequacy of calibration facilities, film storage environments, control of dark room
chemicals, etc.
Note: Only inspectors with relevant NDT
qualifications should undertake this type of surveillance.
5.2.7 Coatings
Protective coatings and surface preparation shall be
monitored for compliance with specified requirements. Such requirements will
normally be found in the client's painting specification, or as a minimum, provided
by the paint manufacturer on data sheets.
Blast profiles and finish shall be witnessed when specified
in the ITP, prior to commencement of painting. Subsequent dry film thickness tests
and adhesion tests shall also be performed to the level specified in the brief.
The inspector shall satisfy himself that the vendor maintains adequate 'real time'
records of blast profiles, environmental conditions and all required inspection
data.
5.2.8 Review of Records and Data Books (MDR)
At the beginning of an assignment the inspector shall
enquire as to the vendor's standard procedures for progressively compiling and
verifying data books or MDR's. Any client specified requirements with regards
to:
- MDR index
- Layout/format
- Deliverable records
- Handover
shall be addressed with the vendor and agreed.
Throughout the life of the assignment, the inspector shall
peruse the progressive compilation of the MDR/data book to ensure the validity of
the data and ongoing maintenance of traceability.
The inspector shall endorse records progressively so as not
to create any delays to MDR handover at the end of the project, and also to ensure
that any anomalies are detected as early as possible.
In general, inspection release certificates shall not be
issued until the MDR has been completely reviewed and signed off by the
inspector.
5.3 Reporting
Following each visit to the works the inspector shall report the
findings, unless instructed otherwise in the brief, on QA Management Services
Inspection Report Form PM2-07-1F, using the following headings.
Inspection reporting performed by QA Management Services may also
involve expediting and reports are thus a combination of inspection/expediting.
Client provided or other approved forms may be used for such reports and all
headings are completed as necessary which may include information other than that
identified in 5.3.1. below.
5.3.1 Form Headers
REPORT NO.: Each report shall be prefixed by the QA
Management Services job number followed by the individual report commencing at ;1,
e.g. 62/1, 62/2 etc.
CLIENT: Usually the end user of material or equipment and
the issuer of the Purchase Order. (Could be a Project Manager).
CONTRACTOR: Company identified in the Purchase Order to
supply materials equipment or services (i.e. the vendor).
PURCHASE ORDER: Order number of Client Order onto
Vendor.
SUB-CONTRACTOR/SUPPLIER: Name of organisation carrying out
the work described in the inspection report, if different from the Vendor.
SUB-ORDER NO.: Sub-order identification from Vendor onto
the Sub-Contractor.
MATERIAL/EQUIPMENT: Material, equipment of service
identified in the prime purchase Order.
ORDER DELIVERY DATE: The Order delivery date as required
in the purchase Order from the Client to the Vendor.
EXPECTED DELIVERY DATE: The date in the opinion of the
inspector when material or equipment is to be released from the works.
Note: The inspector should be careful to identify whether
material or equipment is FOB, FIS or ex works.
INSPECTION STAGE: The inspector shall nominated the stage
in production to which the report refers in accordance with any Inspection and Test
Plans or Inspection Brief.
Examples are Hydrostatic testing, performance testing,
surveillance etc.
Examples are Satisfactory, Non-Conforming, Program delay.
5.3.2 Narrative Report
All reports are to be prepared using the following
headings.
1.0 Summary
A brief summary of the inspection status and
program should precede the report. This should include the date of the
inspection.
2.0 References
Term of reference upon which the inspection has
been gauged or judged.
The reference should be a drawing, code, standard,
specification or 'Brief' requirement.
3.0 Material/Equipment
The identity of the material or equipment being
inspected.
4.0 Test/Inspection
A statement regarding the type of test or
inspection including the inspection and test equipment being used and confirmation
that calibration status was checked and confirmed as accurate.
5.0 Details
This section fully describes the work carried out
by the inspector and the methods of confirming acceptability by the
Vendor/Sub-contractor.
6.0 Results
Describes the results and detail and attachments to
the report which confirm the results.
7.0 Conclusion/Recommendation
An optional part of the report for the inspector to
give an opinion on the work, methods of improvement etc.
8.0 Attachments
Lists any attached records.
6.0 DOCUMENTATION
Typical completed Inspection Report
INSPECTION REPORT
Client:
Project:
Order No:
Sub-Order No:
Contractor:
Subcontractor/Supplier:
Material/Equipment:
Order Delivery Date:
Expected Delivery Date:
Inspection Stage:
REPORT: